LOADING OPERATIONS

Crane, rigging and low-loader placement

We coordinate the most demanding stage of transport: match the crane to the weight and radius, prepare the site and manage rigging, lifting, placement and securing.

Ussuriysk · Vladivostok · Primorye → customer site

SCOPE OF WORK

More than dispatching a crane — a complete controlled lifting operation

01

Input data

Weight, dimensions, centre of gravity, lifting points and site conditions.

02

Crane selection

Capacity, working radius, outriggers, access and load-chart reserve.

03

Rigging

Slings, spreader beam, connection points and lift sequence.

04

Loading

Lift, slew, precise low-loader placement and weight-distribution check.

05

Securing

Positioning, anti-slip materials, chains and inspection points.

06

Unloading

Receiving-site preparation and the reverse operation sequence.

EQUIPMENT AND PROCESS

Loading, up close

Excavator boom loaded onto a low-loader
01Excavator boom loaded onto a low-loader
Undercarriage lift with a spreader beam
02Undercarriage lift with a spreader beam
Mobile crane up to 50 tonnes
03Mobile crane up to 50 tonnes
Compact crane for restricted sites
04Compact crane for restricted sites
25-tonne truck crane
0525-tonne truck crane
Crane for heavy project-site operations
06Crane for heavy project-site operations

MOBILE CRANE CATALOGUE

Crane technical cards

Open each model in a new tab for capacity, boom, chassis and typical applications. Final selection must follow the load chart at the actual working radius.

WORKFLOW

From a cargo photo to a secured low-loader

  1. 01Receive cargo details and site photographs
  2. 02Check access, outrigger positions and crane working area
  3. 03Confirm the lift plan and equipment package
  4. 04Coordinate rigging, loading and securing